Immiscible Infastructure
Wednesday, 30 November 2011
The final assembly of the piece for sculpture class.
These four pictures are some of the first dry assembly variations after the frame had been assembled. I was experimenting with the placement looking for that visual equilibrium.
.
This is after the first coat of varnish has dried on the background.
...drying completely assembled.
The proposed site.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment